close

Dig just a little deeper than the required depth. Place the pond on to its planned position and make sure that it is leveled properly. By filling water and back filling at the same time you can avoid the buckling of the walls. To finish off the job, fill the pond with 10cm of water. Now start doffing the hole taking marked point as a guideline. This few inched of water in the pond will help the unit to settle on sand at bottom properly. Now you need to put the stacks or canes in vertically in the ground with even intervals around the entire unit.

You can make use of stick, handfuls of sand or spade to mark an outline. On the edges of the pond you can either plant perennials or use paving stones along the edges of the pond. Use wood piece to ram sides down while back filling. Prefabricated ponds come in may shapes and designs. Excavate the new marked section down to 10cm at the place where bottom of the unit will rest. Next step is to stabilize the unit by filling in it a small quantity of water. What you need to do now is to mark the outline around the rim of the pond. Make sure that the wall base Suppliers unit sits in place should be flat and level. It is not a bad idea to bring the mark out by 15cm to ensure that any wrong measurement will not spoil the entire process. . Now remove the unit again and you will see that you have an impression of the deeper section on the raked soil. Now fill the remaining large gaps around the unit properly. Place the unit inside the hole and press it down with a little force. Prefabricated ponds are of different shapes and sizes. Whichever pond you have selected, turn it over and place it exactly on the place where you want to install your pond.

Keep checking the surface for level with spirit level or straight edged board. Now rake over the bottom of the hole. Now remove any sharp or large stones from the hole and filled the hole with 5 cm of builders layer. It is better to check the level of the board at 4-5 different directions to ensure the smooth flat level base. Use spirit level to check the level of the unit. You may require your friends help to turn the pond over. Take the unit away and later measure the size of the shelves that are patterned into it and also the depth of the unit. Now position the unit into the hole carefully. The above process work for regular pond shape, if you have an irregular shape of pond, for instance like a kidney shape or any other awkward shape, you need different method to mark the outline.The crucial part of this type of pond is its excavation of the hole - the hole in which the prefabricated unit will sit

arrow
arrow
    文章標籤
    wall base Suppliers
    全站熱搜

    PVC skirting boa 發表在 痞客邦 留言(0) 人氣()